AMRCON is in our new location!
After months of hard work and logistics for our new site, we’re done and all moved in as of May 1st. I’m proud to say that our expertise in project management brought our build-out to a record 6 weeks to complete. We’ve made a big move and it’s thanks to our valued clients. Come and have a look June 10th at 6PM – 8PM during our Grand Opening event.
Here is an idea of what our project consisted of. A formal case study to follow.
- Demolition – Carpet, walls, old cooling unit, flooring
- Carpentry – Drywall, doors, frame work

- HVAC – Reconfigured ceiling returns and ducts, replaced Data Center cooling with 2 Ton wall mount unit
- Electrical – Corrective work, re-cabled tele/data, cleaned up old wiring, installed TV’s, Smart-board
- Metal/Glass – New conference room glass door
- Fire/Security – Fire suppression, IP accessible alarm/alerting for Blackberry, Video Surveillance DVR
- Appliances – Refrigerator, microwave
- Paint – Drywall resurfaced, corrected, painted entire office, painted door frames
- Carpet – New carpet in entire office, Vinyl base
- Window Treatments – All installed privacy shades
- Branding – AMRCON logos, neon, door signs, banners, outdoor signs, lobby signs
- Furniture – Refitted furniture to reuse, purchased new office furniture, conference area furnishings
- Technology – New workstations, data center equipment refitted, over head cable racks, UPS power, Generator, cooling

These were some of the high level aspects of the build. As you can imagine you have permits, insurance and other logistic aspects that also need to be carefully managed in a move to ensure compliance and coverage during the process. We proudly have our vendors/partners displayed throughout the office to introduce you to.
We invite everyone to come and see us. We would like the opportunity to introduce AMRCON to a business looking to move, expand or build-out from start. We would be honored to provide a tour and explain how AMRCON can take many of the headaches out of such a project. Our experience allows us to replicate our process and avoid many of the technological pitfalls that might await you. We will have an official build-out case study coming shortly. However some might only be interested in learning more about AMRCON and ODS Managed Services, we would love to have you check us out as well.
Please be sure to visit us June 10th at 6PM – 8PM for our Grand Opening Event. Call for further details 732-705-5057 ext. 2302 to speak with Brenda.